Engagement plans
On This Lesson 4 topics
This lesson is planned. The outline below lists the topics it will cover. The full lesson has not been published yet.
In this lesson
turn the map into a plan that says who gets what, how often, and from whom.
Planned topics
- For each stakeholder write: what they need to know, what we need from them, channel, frequency, and owner.
- Business leaders get outcomes and decisions needed; engineers get contracts and constraints; operations get run impact; vendors get dates and interface changes.
- Engage early on what a group cares about most, before the design is fixed, so feedback is cheap.
- Plan one-to-one time with high-influence skeptics; do not meet them first in a steering group.
- Review the plan monthly and drop engagements that no longer help.
Draft outline details
Demonstration
an engagement table with columns stakeholder, need from them, message, channel, frequency, owner, with three Larkspur rows filled in (CISO, store operations head, ERP lead).
Check your understanding
Why meet a skeptical high-influence stakeholder one-to-one before the steering group?
Show answer
So concerns surface privately and can be addressed without surprising or embarrassing anyone.