Overview

Topics

  • Governance
  • compliance checks
  • design exceptions

Learn first

2.5 h of practice (estimate)

Learning outcomes

  1. Prepare a solution for an architecture review board (ARB) submission.
  2. Demonstrate compliance with architecture principles and standards.
  3. Request and justify design exceptions with mitigations and expiry dates.
  4. Act on ARB conditions and track them to closure.

Lessons

  1. 01What review boards are for
  2. 02Preparing a submission
  3. 03Compliance checks
  4. 04Exceptions and conditions
  5. 05Demo: a Larkspur ARB session with conditions

Lab and exercises

Lab

ARC-035-LAB1 · ARB submission

Outcomes: 1–4 · Time: ~2.5 h

  1. Draft the submission: the decision asked, context, options considered, recommended solution, and risks.
  2. Pre-wire at least two role-played board members and record their concerns.
  3. Build the compliance table against the provided principles and standards with evidence links.
  4. Write one exception request with mitigation, owner, and expiry.
  5. Present to the role-played ARB and respond to the conditions raised.
  6. Create the condition tracker with owners, dates, and closure evidence.

Acceptance: approval or conditional approval with a closure plan.

Exercises (case-based; five exercises)

IDOutcomeTask
ARC-035-EX011Larkspur's board meets monthly and the pre-read deadline is five days before. Create a timeline from today to a decision and list who you pre-wire and why.
ARC-035-EX022Review a compliance table that is all green with no evidence. Rewrite three lines honestly with status and evidence.
ARC-035-EX033Write an exception for using a file-transfer interface with ERP when the standard requires APIs; include risk, mitigation, owner, and expiry.
ARC-035-EX043The board rejects an exception request with no expiry date. Explain why and repair the request.
ARC-035-EX054The board approves with three conditions. Build a tracker, assign owners, and write the status report you will send in six weeks.
Show solutions
  • EX01 Work backwards: decision date, pre-read five days earlier, pre-wiring in the two weeks before, draft earlier still; pre-wire security (data classification), infrastructure (hosting), and data (retention), each with their likely concern.
  • EX02 Example: "API-first integration: compliant with condition, order posting uses APIs, ERP stock feed uses file transfer, see ADR-004"; each line has a design element and an evidence link.
  • EX03 Standard: API-first; reason: ERP cannot expose APIs before its upgrade; risk: delayed and unauthenticated data; mitigation: encrypted transfer, reconciliation job, alert on missing files; owner: integration lead; expiry: ERP upgrade milestone, with re-review date.
  • EX04 Without expiry the exception becomes permanent and the risk is never revisited; add an expiry date or trigger and a review owner.
  • EX05 Tracker columns: condition, owner, due date, evidence, status; report lists closed, in progress, and at-risk items with the plan for each.

All four outcomes are also covered by the lab acceptance and the quiz.

Workplace evidence: a solution you took through formal architecture governance.

Quiz

Outcomes: O1 prepare a submission · O2 demonstrate compliance · O3 exceptions with mitigation and expiry · O4 conditions to closure.

A self-check for you: nothing is graded, saved or sent anywhere. Choose an answer, then check it. You can try again as often as you like.

  1. 1The main purpose of an ARB is to:O1
  2. 2Pre-wiring means:O1
  3. 3A good submission starts with:O1
  4. 4A credible compliance table has:O2
  5. 5Which is evidence for "no direct database access between systems"?O2
  6. 6A design exception request must include:O3
  7. 7An exception without an expiry date:O3
  8. 8The ARB grants conditional approval. You should:O4
  9. 9Which behavior damages trust with the board?O4
  10. 10Larkspur must use a file transfer interface to ERP until its upgrade. The best mitigation entry is:O3

Practical part

ARB simulation on the Larkspur lab: submission, one exception, role-played board challenges, and a condition tracker. Pass: quiz at least 8/10, at least four of five exercises correct, and a simulation ending in approval or conditional approval with a closure plan.

Common mistakes

Surprising the board; exceptions without expiry; ignoring conditions after approval.

Assessment

ARB simulation.

Workplace evidence

A solution you took through formal architecture governance.

Career relevance

Governance is a routine part of enterprise architecture work.

Type to search levels, phases, modules and lessons.