Pilots and rollout
On This Lesson 4 topics
This lesson is planned. The outline below lists the topics it will cover. The full lesson has not been published yet.
In this lesson
plan a staged rollout with pilots, training, and support.
Planned topics
- Pilot with volunteer teams first, including a skeptic and a team with a different codebase type.
- Use a control group or a baseline period so results can be compared.
- Provide training on prompting, verification, and what never to paste; name a support channel and an owner.
- Gate widening on criteria: policy in place, security review passed, metrics reviewed.
- Collect structured feedback, not only anecdotes.
Draft outline details
Demonstration
Rollout timeline: weeks 1-2 baseline and policy, weeks 3-8 pilot with two teams and a control, week 9 review gate, weeks 10-14 wider rollout, ongoing review.
Check your understanding
Why need a control group or baseline?
Show answer
Without it, you cannot tell the tool's effect from other changes.
Practice
Apply this lesson with the module's lab, exercises and quiz.