Planned lessonSRB-015-L06

Demo: cutting cost per order by 30%

  • Lesson 6 of 7
  • Senior B
On This Lesson 3 topics

This lesson is planned. The outline below lists the topics it will cover. The full lesson has not been published yet.

In this lesson

plan a 30% cost-per-order reduction on the combined platform with traceable estimates; prepares SRB-015-LAB1.

Draft outline details

Step by step

  1. Compute the baseline cost per order from the bill and order counts.
  2. Rank line items by cost and by saving potential.
  3. Estimate savings per lever (rightsizing, non-production schedules, storage tiers, duplicate service consolidation) with evidence from usage data.
  4. Planned mistake: pick many small items because they are easy. Fix: focus on the top drivers; small items only if they are quick and safe.
  5. Check each saving for reliability impact (redundancy, headroom) and record risks.
  6. Sequence the plan and set a measure for each step.

Check your understanding

What makes the savings estimate credible?

Show answer

Each figure is traceable to bill lines and usage data.

Practice

Apply this lesson with the module's lab, exercises and quiz.

Lab and exercises Quiz