Skip to content
Ameen Abozaid
Planned lessonSRB-015-L04

Optimization levers

  • Lesson 4 of 7
  • Senior B
On This Lesson 4 topics

This lesson is planned. The outline below lists the topics it will cover. The full lesson has not been published yet.

In this lesson

choose levers that reduce cost without harming reliability.

Planned topics

  • Rightsizing: match resources to measured usage.
  • Autoscaling and scheduling: scale down off-peak, shut non-production at night.
  • Commitments: reserved or savings plans for steady baseline load; analyze before committing.
  • Storage tiers and lifecycle rules; delete or compress what is not needed.
  • Architectural changes: reduce data movement, cache, batch, consolidate duplicate services.
Draft outline details

Demonstration

Lever table: lever | saving estimate | risk | engineering effort | evidence needed. Example: non-prod nightly shutdown | moderate | low | small | usage data.

Check your understanding

What must you check before buying a commitment?

Show answer

That the baseline usage is stable enough to use it.

Practice

Apply this lesson with the module's lab, exercises and quiz.

Lab and exercises Quiz

Marking a lesson complete is optional and you can undo it any time. Your progress stays in this browser.

Continue to next lesson

Type to search levels, phases, modules and lessons.