Quality gates
On This Lesson 4 topics
This lesson is planned. The outline below lists the topics it will cover. The full lesson has not been published yet.
In this lesson
block bad changes automatically.
Planned topics
- Gates: unit and integration tests, contract verification (MID-045), coverage thresholds, static analysis, dependency and image scans (MID-053).
- A gate must be fast, reliable, and clearly owned; flaky gates get ignored.
- Coverage thresholds guard against regressions; do not chase 100%.
- Post-deploy gates: smoke tests and SLO checks (MID-049).
Draft outline details
Demonstration
stage list with fail conditions: tests pass, no critical CVE, contracts verified, coverage not below baseline.
Check your understanding
Why do flaky gates hurt?
Show answer
People learn to ignore or bypass them.
Practice
Apply this lesson with the module's lab, exercises and quiz.