Proofs of concept that reduce risk
On This Lesson 4 topics
This lesson is planned. The outline below lists the topics it will cover. The full lesson has not been published yet.
In this lesson
design a PoC that tests the riskiest assumptions, not the easy ones.
Planned topics
- List the top risks (integration with the ERP, peak performance, security) and pick what to test.
- Define success criteria before starting and a time limit.
- Use realistic data and load, not demo data.
- A PoC answers questions; it is not the first release.
Draft outline details
Demonstration
a PoC plan: risk, test, success measure, effort. Example: ERP order sync at 500 orders per hour, 99% under 30 s, using test data from a copy of last year's peak.
Check your understanding
What should a PoC test first?
Show answer
The riskiest integration or quality assumption.