Skip to content
Ameen Abozaid
Planned lessonSRB-017-L01

Anatomy of a large migration

  • Lesson 1 of 8
  • Senior B
On This Lesson 4 topics

This lesson is planned. The outline below lists the topics it will cover. The full lesson has not been published yet.

In this lesson

break a migration into reversible phases with measurable checkpoints.

Planned topics

  • Phases: prepare, build new path, run in parallel, shift traffic, verify, decommission.
  • Every phase has an entry check, a measurable exit check, and a rollback.
  • Prefer many small reversible steps over one big cut-over.
  • Name an owner for each phase and a single place that shows current status.
Draft outline details

Demonstration

Phase table: phase | change | exit measure | rollback. Example: shadow read | compare shipment status old vs new | mismatch rate below threshold | stop shadow, no user impact. This follows the extraction phases planned in SRB-008.

Check your understanding

What must every phase have?

Show answer

An exit measure and a rollback.

Practice

Apply this lesson with the module's lab, exercises and quiz.

Lab and exercises Quiz

Marking a lesson complete is optional and you can undo it any time. Your progress stays in this browser.

Continue to next lesson

Type to search levels, phases, modules and lessons.